Started the day by Joining the top to the side legs. Installed pull wires for later use when we install the electronics. Then added upper support pads to the lower leg.
We got our first look at it and proved the attachment points. Checked Height and angle of top and sides. Very happy with it so far.
Finished out the day by making the fwd legs and duct taping them to the top for analysis.
Side looks good but front view needs a little adjustment down and out. They are slightly in the line of vision and there is room to move them. Easy move with the duct tape connection.