This is the original arch and bimini soft top. It leaks and is in need of replacement. Fortunately this customer would like to drastically improve this with a Higgins Marine Metals Hardtop After many concept variations the owner has decided on this profile for the support structure. Now the work begins Top will be finished and painted then attached to a brushed anodized pipe structure. I utilized the same exact mounting points that the arch was on. Rod holders will be on the drop ring for access from the aft deck. top is prepped with epoxy primer. Bottom side will get Urethane enamel and the top will be urethane enamel with non skid added. Structure is removed and placed in a welding fixture and welded out completely
|
Archives
October 2015
Categories
All
|