Now the work begins
This is the original arch and bimini soft top. It leaks and is in need of replacement. Fortunately this customer would like to drastically improve this with a Higgins Marine Metals Hardtop After many concept variations the owner has decided on this profile for the support structure. Now the work begins Top will be finished and painted then attached to a brushed anodized pipe structure. I utilized the same exact mounting points that the arch was on. Rod holders will be on the drop ring for access from the aft deck. top is prepped with epoxy primer. Bottom side will get Urethane enamel and the top will be urethane enamel with non skid added. Structure is removed and placed in a welding fixture and welded out completely
1 Comment
8/28/2023 08:01:06 am
I wanted to express my gratitude for your insightful and engaging article. Your writing is clear and easy to follow, and I appreciated the way you presented your ideas in a thoughtful and organized manner. Your analysis was both thought-provoking and well-researched, and I enjoyed the real-life examples you used to illustrate your points. Your article has provided me with a fresh perspective on the subject matter and has inspired me to think more deeply about this topic.
Reply
Leave a Reply. |
Archives
October 2015
Categories
All
|