Today begins with a fixture to be able to weld the components together and eventually transport to the paint shop. Then I started on the aft side legs and even got a look at them on the boat for a test fit.
This is the actual surface the side legs will attach to.
Side leg beginning to take shape
Needs a little adjustment but really close.